MAINTENANCE SCHEDULE

Here is a suggested maintenance schedule that is suitable to use for most deck coatings; it's in an Excel format,  a copy of this template can also be found at Microsoft's online template website. Use this schedule to  jog your memory about when maintenance items need to be done.   For specific information on manufacturer's maintenance guidelines, Click Here to go to our Deck Coating Types page listing many manufacturer's products. There are links to many manufacturer's maintenance instructions there.                               

 

 

           

Deck Maintenance Schedule

This is a starting list; you can customize it to yourspecific coating and needs by revising this document and doing a "Save As" .

Weekly

Date last completed

Deck Surface

Wash off with hose or sweep dirt off.

Quarterly

Date last completed

Plants/Pots/Grills/Tables/Chairs

Move off of deck, clean/scrub surface where plants and grill may have stained surface.

Mats

Remove and allow surface to dry off, sweep away debris-Mats should only be jute, never rubber backed!

Scuppers/Drains

Visually check and clear as necessary. Drains-flush out with water each quarter

Deck Surface

Check for cracks, nails popping through, signs of sift plywood, peeling paint, burns, holes

Remove leaves/debris that could block drains or scuppers when it rains.

Bi-Annually

Date last completed

Deck Surface

Check for cracks, nails popping through, signs of sift plywood, peeling paint, burns, holes

Scuppers/Drains

Visually check and clear as necessary. Drains-flush out with water each quarter

Mats

Remove and allow surface to dry off-Mats should only be jute, never rubber backed!

Plants/Pots/Grills/Tables/Chair

Move off of deck, clean/scrub surface where plants and grill may have stained surface.

Walls/areas around deck

Check siding and stucco for cracks and splits, adjacent hose bibs, dryer vents lights and electric outlets that they are caulked and attached properly.

Yearly

Sliding Door

Check weep holes on sliding door, they can get blocked up and may simulate a deck leak.

Every ( 2-5 ) Years

Deck Coating Surface

Remove every item from deck, clean surface, repair defects and damages and then apply new sealer according to mfg's instructiofffns. This is normally a reserve expense, check with your CPA.

Every ( 20-30 ) Years

Replace entire deck system

This may entail opening siding or stucco to remove and replace flashings, removing doors too. This is a reserve item that should be paid for over 20-30 years of contributions to reserves.