Accolades and Thank You's

Good afternoon Bill,
 
I came across your website today (like a ray of shiny hope ;) and would like to know if we could arrange an inspection of a balcony here in SLO?
Lynn I  2/10/2010

SHOP AMAZON NOW!

Need Advice? Ask the Deck Expert!

  • Waterproofing Deck Questions?
  • Money Back Guarantee!

The Deck Expert
is now
on Twitter...

    Come Follow Me on Twitter

    Sample Inspection Report

    E-mail Print PDF

    Below is a copy of a sample inspection report, exactly like what you will receive when you retain us to perform your deck inspections.

    Take a look through and see what we report on, how we describe the issues and what you need to do to correct the problems we have found. Not every deck is the same and each deck at your Association requires it's own inspection.

    While the sample deck below has lots of problems, catching them early on allows an HOA to correct the problems quickly, before these small problems become large expensive problems.

    • Inspection cost = $12.00 (based on 100+ units)
    • Repairs to this deck estimated at approximately $1,000-$1,500.00
    • Estimated repair costs to replace a deck with rotted framing = $5,000.00 to $7,000.00.
    • Estimated aggravation factor dealing with frustrated homeowner = HIGH!
    • Having us save you time, money and aggravation = PRICELESS!

    Contact us for our services today.

     


     

    Waterproof Deck Coatings Inspection Check List

    Company Name: Waterproofdeckcoatingadvice.com
    Company Address: PO Box 14438
    City: San Luis Obispo State: CA Zip: 93406

    Customer Name: Mary Manager Job # 2006-1001 Inspection Date: 12/26/2006
    Property Address: 1010 Happy HOA Way HOA name: Happy Times HOA Time: 2pm
    1 = Excellent; 2 = Good; 3 = Fair; 4 = Poor; NR = Not Rated
    NR Waterproof Coating Type: Slip Sheet Slip sheet coatings should be resealed every 2-3 years for maximum longevity.  
    NR Known Leaks: No    
    3 Condition Needs to be resealed ASAP.  
    NR Direction Deck Faces: Southeast Decks facing south and west typically need more maintenance than those facing north or east. Decks facing north or east may take longer to dry after rain occurs.  
    3 Roof Coverage: 26-50% Decks covered with a roof or trellis usually need less maintenance than those exposed to full sun.  
    NR Substrate: Plywood/OSB Substrate can only be evaluated when visible. While we do check for soft or damaged areas, we cannot be responsible for hidden damages.  
    4 Drains/Scuppers: Yes, scuppers are installed Scupper outlet blocked by flashing material. Completely Obstructed from leaves or debris, needs to be cleaned out.
    3 Slope: Surface Sloped Ponding water should evaporate or drain off within 24 hours after cessation of rain for Mer-Kote coatings.  
    4 Ponding Water: Ponding water present at time of inspection. Ponding water noted at outside edge, it appears the drip flashing/fascia is higher than the level of the deck. This condition should be corrected as problems may develop over time.
    4 Contiguous Building Materials: Contiguous building materials have obvious problems such as cracks, splits, checks in the siding or stucco. A person knowledgeable in building construction should evaluate the building at this deck for possible necessary repairs. Contiguous building materials must be kept in a weatherproof condition as leaks can result that can damage the deck, it's framing or the substrate.
    3 Railings: Penetrate Coating Railing bases need to be caulked yearly and kept painted, free from rust.
    4 Door Threshold: Sliding door, threshold on deck surface. Threshold is not raised off surface.Weep hole blocked by decking material will not allow water to escape as it was designed.
    4 Weep Screed/Sliding Clearance: Weep screed is in contact with or has limited clearance from deck surface. Weep screed or wood siding should be a minimum of 1 1/2" above the deck surface.
    NR Stair Nosing: Not applicable, no stairs access this deck..    
    4 Flashing: Visible flashing at wall to deck has openings or is otherwise compromised.Further evaluation is advised. Most leaks on decks occur at the flashing terminations. Properly lapped and sealed flashing, is essential to a waterproof deck working properly.
    3 Potted Plants on Deck: Yes, potted plants are present on deck and some or all are in direct contact with deck surface. Resident needs to raise pots off surface via "pot feet" to allow water to dry off.  
    4 Grill/BBQ on Deck: Yes, a charcoal or gas grill is on the deck. Grease or hot coals has damaged the deck surface or contiguous building surfaces. A pan needs to be placed under grill to protect surface from grease and hot coals.
    NR Indoor/Outdoor Carpet:No carpet is present at time of inspection.    
    4 Rubber Mat on Deck: Yes a mat that can trap water underneath it is present. Rubber and other water trapping mat can damage deck coatings. Remove and replace with a mat that won't trap water underneath it.
    2 Tables/Chairs: Yes, tables/chairs are on the deck. Chair tips are installed on legs.    

    Poor Summary

    1. Drains/Scuppers: Yes, scuppers are installed Scupper outlet blocked by flashing material. Completely Obstructed from leaves or debris, needs to be cleaned out.
    2. Ponding: Water Ponding water present at time of inspection. Ponding water noted at outside edge, it appears the drip flashing/fascia is higher than the level of the deck. This condition should be corrected as problems may develop over time.
    3. Contiguous Building Materials: Contiguous building materials have obvious problems such as cracks, splits, checks in the siding or stucco. A person knowledgeable in building construction should evaluate the building at this deck for possible necessary repairs. Contiguous building materials must be kept in a weatherproof condition as leaks can result that can damage the deck, it's framing or the substrate.
    4. Door Threshold: Sliding door, threshold on deck surface. Threshold is not raised off surface. Weep hole blocked by decking material will not allow water to escape as it was designed.
    5. Weep Screed/Sliding Clearance: Weep screed is in contact with or has limited clearance from deck surface. Weep screed or wood siding should be a minimum of 1 1/2" above the deck surface.
    6. Flashing: Visible flashing at wall to deck has openings or is otherwise compromised. Further evaluation is advised. Most leaks on decks occur at the flashing terminations. Properly lapped and sealed flashing, is essential to a waterproof deck working properly.
    7. Grill/BBQ on Deck: Yes, a charcoal or gas grill is on the deck. Grease or hot coals has damaged the deck surface or contiguous building surfaces. A pan needs to be placed under grill to protect surface from grease and hot coals.
    8. Rubber Mat on Deck: Yes a mat that can trap water underneath it is present. Rubber and other water trapping mat can damage deck coatings. Remove and replace with a mat that won't trap water underneath it.

    PDspect, ©2006, PDmB, Inc. - End of Report